Federal Avenue Remodel

 

This project is a complete interior renovation of a 1923 Capitol Hill home that backs up to Volunteer Park.

 
Exterior of home will remain mostly intact.

Exterior of home will remain mostly intact.

Entry

Entry

Living room

Living room

Living room

Living room

Dining room

Dining room

Kitchen

Kitchen

Master bedroom

Master bedroom

Bedroom

Bedroom

Patio renovation

Patio renovation

28' steel   beam delivered to give the main floor open concept.

28' steel beam delivered to give the main floor open concept.

28' steel beam delivery for main floor open concept

28' steel beam delivery for main floor open concept

Access for the new steel beam.

Access for the new steel beam.

Temporary walls built for installation of steel beam.

Temporary walls built for installation of steel beam.

Steel beam installed!

Steel beam installed!

IMG_5795.jpg
IMG_5797.jpg
IMG_5798.jpg
The main floor is getting in floor hydronic heat.    Each of the grooves will have a pipe installed.

The main floor is getting in floor hydronic heat.  Each of the grooves will have a pipe installed.

IMG_5958.jpg
IMG_5959.jpg
IMG_5956.jpg
New kitchen location

New kitchen location

IMG_5980.jpg
Powder room

Powder room

IMG_5985.jpg
Laundry and mud room off kitchen

Laundry and mud room off kitchen

Dining area

Dining area

Master bathroom

Master bathroom

kid's bath with tub

kid's bath with tub

Kid's bath with shower

Kid's bath with shower

Spray foam insulation throughout

Spray foam insulation throughout

Drywall

Drywall

IMG_6014.jpg
IMG_6015.jpg